Client:
								
								
												Dallas Area Rapid Transit
DART retained Halff for a multiple work-order contract involving environmental services for current and future phases of light rail transit build-out, bus operations and commuter rail operations. Services included the following:
- On-demand emergency response services
 - Completion of Phase I Environmental Site Assessments (ESAs)
 - Site investigations/contamination assessments to fully evaluate impacted properties
 - Development and implementation of remedial actions under the Texas Commission on Environmental Quality (TCEQ) Petroleum Storage Tank (PST)/Texas Risk Reduction Program (TRRP) rules to close sites with contaminated soil and/or groundwater under the Voluntary Cleanup Program (VCP), Innocent Owner Program (IOP), PST or Corrective Action (CA) programs
 - Municipal Setting Designation (MSD) assistance
 - Comprehensive management and construction associated with petroleum storage or fueling system services
 - Sampling and testing of soil, water, regulated materials and miscellaneous containers
 - Removal and proper disposal of hazardous materials/waste
 - Implementation and compliance with SPCC and SWP3 requirements, performing periodic inspections and conducting stormwater visual sampling events
 
							Halff Services 
 Involved
						
					- Environmental
 - Geographic Information Systems
 - Public Works
 
- Structural Engineering
 - Surveying
 
Let’s Connect
Ready to work with Halff? Simply fill out the form to be directed to the best person at Halff to discuss your interests.